eG Monitoring
 

Measures reported by OVMMgrJobTest

A job is a set of one or more operations made in the Oracle VM Manager. This test monitors the jobs on the Oracle VM Manager and reports the number of jobs that were started, completed, successful, failed etc. The detailed diagnosis of the test enables administrators to perform further diagnosis on the failed and outstanding jobs.

The measures made by this test are as follows:

Measurement Description Measurement Unit Interpretation
No_of_starts Indicates the number of jobs started in the Oracle VM Manager during the last measurement period. Number  
No_of_completions Indicates the number of jobs that were completed in the Oracle VM Manager during the last measurement period. Number  
No_of_successes Indicates the number of jobs that were completed successfully in the Oracle VM Manager during the last measurement period. Number A high value is desired for this measure.

The detailed diagnosis of this measure if enabled, lists the jobs that succeeded.

No_of_failures Indicates the number of jobs that failed in the Oracle VM Manager during the last measurement period. Number Ideally, this value should be low. A high value could warrant an investigation into the reason for the consistent failure of jobs. Use the detailed diagnosis of this measure to view the jobs that failed.
Failure_pct Indicates the percentage of jobs that failed in the Oracle VM Manager. Percent Ideally, this value should be low. A high value could warrant an investigation into the reason for the consistent failure of jobs.
Avg_time Indicates the average time taken to complete the jobs in the Oracle VM Manager. Secs A low value is desired for this measure. A sudden/gradual increase in the value of this measure is a cause of concern.
Max_time Indicates the maximum time taken to complete the jobs in the Oracle VM Manager. Secs  
No_of_outstandings Indicates the number of outstanding jobs in the Oracle VM Manager during the last measurement period. Number A large number of outstanding jobs could indicate a bottleneck. Use the detailed diagnosis of this measure to know which are the outstanding jobs.